New Doors All Around

Beautiful new 5-panel doors now live in the five doorways of our second story. We replaced four existing doors that where too short (due to removing carpet and vinyl tile) not square and UGLY! We added a door that's been missing since we moved in between the master bedroom and bathroom, and added mirrored sliding doors to the closet in the master bathroom.

When we painted the upstairs last year we took extra care to get perfectly straight lines where the walls met the doorway  trim. It was only after we finished painting that we realized installing new doors would mean removing the trim and reinstalling it (which would completely destroy the paint job we slaved over). WHOOPS! Here's the state of the salvaged trim after the new doors were installed:

David tackled the touch-up work around the trim which included patching, sanding, texturing, priming and painting each blemished spot. Then he painted each door a ultra white to match the trim and added new oil-rubbed bronze hardware. Here's a look at the transformations:
(You might notice a sneak peak of the renovations that are almost done in both bathrooms--I'll be posting about those very soon!)

Guest Bathroom: Door now opens into the bathroom rather than out. (By far the worst door to begin with!)

Master Bathroom: This doorway was sans door, trim or even flooring when we moved in.

Guest Bedroom (now Aiden's room): We were sad to see this original five-panel door go,
but we donated it to a local rebuilding center through which we hope it finds a new home.

Office (now the Office/Guest Room)

Master Bathroom
Master Bathroom Closet

Wednesday, August 18, 2010

Master Bathroom Progress

While we've been busy painting downstairs, a steady stream of contractors have been working their magic upstairs in our master bathroom. Here's a quick run-down of what's been going on:

Electrical Progress:
- Added breaker to the electrical box for new whirlpool tub
- Wired and installed an outlet for the new whirlpool tub to plug into
- Added a second electrical outlet to the wall that will be home to our double vanity
- Wired the new air vent (complete with additional light and heater)
- Added a second double-light switch to control the air vent, light and heater (given that there will be four light switches for the bathroom, it may take me a while to figure out which switch does what!)

Plumbing Progress:
- Pipe adjustments were made to the tub/shower area to accommodate the new tub
- The new whirlpool tub was installed
- The previous single-faucet plumbing was split into two faucet connections
- The toilet to floor connection damaged when the old toilet was removed was replaced

Shower Window Upgrade:
- Old, damaged window (that didn't open) was replaced with a brand spanking new window that actually opens

Tile Prep Work
- Cement board was applied to the shower area and the floor

Wall Repair Work
-The wall that was opened up for plumbing work has been patched

Here's some snapshots of the progress:
My dream come true...two faucets!
Drywall repaired around the new faucets.
Our new whirlpool tub in all it's glory!
David couldn't resist testing out the new tub after a long day of working on the house--beer in hand!
He didn't mind having to turn the water on and off with a wrench.


Before: Water damaged wood window that didn't open.
After: Beautiful new vinyl window that will resist water damage and OPENS!

Inspector Poof checking the cement board progress on the floor.
Cement board installed in the shower area.

Next up the drywall repair will be sanded and textured, and the room will be ready for paint! We've picked out a beautiful light blue color and I can't wait to see up on the walls! Stay tuned. :)

Just for fun, here's a comparison of what we started with and what it looks like now. Even the unfinished bathroom looks a million times better than it did before!

Thursday, July 22, 2010

Master Bathroom: Smashy! Smashy!

David showed our master bathroom who was boss over the past week! He ripped out the shower tile, removed the shower doors, removed the bathtub, removed the toilet, removed the floating shelf that cut through the room and (apparently) used to be in style, removed the vanity and mirror, chipped away the tile flooring and opened up the wall where plumbing and electrical work will be done. It was quite the task but David accomplished it in record time! He's pretty much a pro at destroying rooms in our house by now. :)

It wasn't a surprise to find the original douglas fir flooring underneath the tile as we've found it in every other room of the house--although a portion of the flooring near the (non-existent) door was removed and patched with plywood at some point. It was a surprise to discover a fairly level base flooring surface on which to put cement board and new tile! Our guest bathroom floor situation did not prove to be so user-friendly.

The room is now ready for electrical and plumbing work which will begin next week!!

Click here to see the bathroom pre-destruction.

Tuesday, July 20, 2010

Master Bathroom Renovation Begins!

It's been a while since the last update but we've been hard at work moving forward on many projects. 

I'm excited to report that we've started work on the master bathroom renovation—the project I've anxiously awaited since the day we bought the house! The master bath was, by far, the ugliest room in the house that had to be used on a daily basis. For the past year we've been living with a bathroom that has no door, plywood flooring, a closet with no door, hideous tile throughout, not enough storage, etc, etc.

Here's a look at what we are starting with:

Thursday, March 25, 2010

Guest Bathroom: Less Floor is More

Removing the layers of flooring which have accumulated over the past 99 years was the latest guest bathroom demo project.

In the shower area, there were two layers of
linoleum and three layers of plywood to rip up. In the rest of the bathroom, there were two layers of linoleum, two layers of plywood, a surprise layer of original tongue-and-groove Douglas Fir (a sweet surprise!) and a layer of metal.

David removed all the layers down to the original fir. Our goal is to salvage the fir to use as patches for the master bedroom floor (click here to see the wall we tore out) and the soon-to-be hole in the kitchen floor.

First the linoleum was removed:
Then off came the plywood:David's saw blade was the first to meet this layer of metal:We were pretty excited to discover original fir floors:Project 'Save The Fir Floors' begins this weekend. Click here to see what the bathroom looked like before demo began.

Wednesday, March 3, 2010

Guest Bathroom: Take THAT!!!

Smashy smashy make David happy.

Before:
After:
Before:
After:

Saturday, February 13, 2010

Guest Bathroom: The Renovation Begins

Here's the current state of bathroom:





The guest bath is especially challenging because of its small size. Our general plan is:

- tile floors
- pedestal sink
- remove current shower enclosure and replace with something that gives the option for a bath or a shower
- replace toilet
- repaint walls
- strip and repaint original medicine cabinet, replace glass

The biggest challenge is the tub/shower issue. Right now there is only a shower in the room but we want to add a bathtub option for when we have kids. That is going to be a challenge given the tub/shower area is only 52" wide and about 36" deep.

Let the renovation begin!

Monday, January 11, 2010

DIY Resolution #1: Roman Shade

I'm no Martha, but sometimes I pretend I to be.

A variety of greenery provides privacy in our master bathroom throughout most of the year but come Winter, a few neighbors can probably see more than they bargained for. Enter the need for a Roman Shade. I wanted the shade to have a sheer quality without compromising privacy, an organic quality to the pattern sans anything that felt cookie-cutter, white on white, a little sheen and of course, sized appropriately to fit the window of interest. As you may have guessed, I didn't find it. So, I decided to make my own.

I'll spare a detailed write up of the process and just post a photo montage. If you're interested in making a shade, just let me know via comment and I'd be happy to forward links of the sources I used.

In a nutshell:The finished product:
And here is the shade in all its glory—filtering a beautiful glow of morning light. You can see the Winter chill in the air...Total Cost = $24.95
Breakdown: pulley hardware $3.95, cord 79¢, cord rings 30¢, dowels $1.26, Velcro $1.99, backing fabric (muslin) $2.25, shade fabric $11.42, ceiling fan pull (adapted as the cord pull) $2.99

Not too shabby for a custom shade that I absolutely love. This DIY resolution of mine might turn into an obsession. I like getting exactly what I want!

Friday, December 11, 2009

In the closet? Out of the closet? I say all that really matters is that there's a door on that closet.

And our office closet now has a door. We ordered the thing FOREVER ago and it just arrived. The guy at Lowe's apologized for it taking so long and claims there was a 'holiday rush'. Hmm...a holiday rush for closet doors? Riiight. I think they just forgot about our order until David called to check on it a few weeks ago.

Here's a look at what the closet looked like when we moved in (eww):
Dave installed the new shelves and racks in October and we were just waiting for that door to arrive...
The closet opening needed to be lowered slightly for the closet door to fit:We decided on a mirrored door with trim the color of the floors andd here's the finished product: